RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026464 - Archived data from Tue, 11. August 2020 17:21:36 CEST


This is all the information about APD 2407026464. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026464
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3394817 V     T = -25 °C: 346.8913911 V
Voltage for Gain 150: T = +20 °C: 390.1706683 V     T = -25 °C: 354.3685107 V
Voltage for Gain 200: T = +20 °C: 394.5190433 V     T = -25 °C: 358.5291419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.516870236 V-1     T = -25 °C: 4.858518938 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.684836595 V-1     T = -25 °C: 9.082275353 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22072244 V-1     T = -25 °C: 16.06670907 V-1
Break-through voltage: T = +20 °C: 409.6043665 V     T = -25 °C: 373.7633208 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:12 CET jreher Updated box and position via API.
03. Feb 2021 18:15:20 CET jreher Updated box and position via API.
07. Oct 2020 12:16:40 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:15 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:36 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:26 CET jreher Updated box and position via API.
27. Nov 2019 19:31:21 CET jreher Updated APD location via API.
25. Nov 2019 17:11:46 CET jreher Updated box and position via API.
04. Jul 2019 11:07:43 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 12:29:16 CET markus.moritz
30. Nov 2018 13:30:50 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.