RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026460 - Archived data from Tue, 11. August 2020 17:21:35 CEST


This is all the information about APD 2407026460. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026460
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2407026456/2407026460
Unit: #840 (barcode 1309009237)
Preamp: 4597
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0754381 V     T = -25 °C: 345.5133788 V
Voltage for Gain 150: T = +20 °C: 388.8874341 V     T = -25 °C: 352.8859597 V
Voltage for Gain 200: T = +20 °C: 393.2890757 V     T = -25 °C: 357.0420635 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.475741356 V-1     T = -25 °C: 4.644536795 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.66929753 V-1     T = -25 °C: 9.457719869 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.67614803 V-1     T = -25 °C: 15.66469739 V-1
Break-through voltage: T = +20 °C: 409.1424826 V     T = -25 °C: 372.656015 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:12 CET jreher Updated box and position via API.
03. Feb 2021 18:15:20 CET jreher Updated box and position via API.
11. Aug 2020 17:21:35 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:31:21 CET jreher Updated APD location via API.
25. Nov 2019 17:11:46 CET jreher Updated box and position via API.
15. Jul 2019 15:44:46 CEST jreher Assigned to unit by script
15. Jul 2019 15:21:49 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:43 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 13:04:39 CET markus.moritz
30. Nov 2018 13:31:53 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.