Show Hamamatsu Avalanche Photo Diode 2407026459 - Archived data from Fri, 30. November 2018 13:32:22 CET
This is all the information about APD 2407026459. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2407026459 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G08 |
Break-through voltage: | 411 V |
Voltage for Gain 100 (T=+25°C): | 382.6 V |
Dark current: | 5.9E-9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 11 |
Position in Box: | 32 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 12. Nov 2018 |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:49:12 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:15:20 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:21:35 CEST | jreher | Updated APD characteristics via API. |
27. Mar 2020 11:32:37 CET | jreher | Assigned to capsule by script |
13. Feb 2020 15:25:41 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:31:21 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:11:46 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:07:42 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:46:14 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:09 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:02:51 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:12:57 CET | Tobias | Corrected dark current unit. |
13. Dec 2018 13:05:57 CET | markus.moritz | |
30. Nov 2018 13:32:22 CET | markus.moritz | |
12. Jan 2018 13:16:54 CET | Tobias | Imported from Hamamatsu datasheet. |