RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026454 - Archived data from Thu, 03. January 2019 00:12:56 CET


This is all the information about APD 2407026454. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026454
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 353
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:21:06 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:35 CEST oafedulidis Updated box and position via API.
21. Apr 2021 14:47:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:11 CET jreher Updated box and position via API.
03. Feb 2021 18:15:19 CET jreher Updated box and position via API.
11. Aug 2020 17:21:34 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:20 CET jreher Updated APD location via API.
25. Nov 2019 17:11:46 CET jreher Updated box and position via API.
04. Jul 2019 11:07:42 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:51 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:12:37 CET markus.moritz
30. Nov 2018 13:35:46 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.