RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026446 - Archived data from Tue, 11. August 2020 17:21:33 CEST


This is all the information about APD 2407026446. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026446
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.228952 V     T = -25 °C: 351.4758178 V
Voltage for Gain 150: T = +20 °C: 395.0969288 V     T = -25 °C: 358.9289925 V
Voltage for Gain 200: T = +20 °C: 399.5058409 V     T = -25 °C: 363.1396552 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.506482132 V-1     T = -25 °C: 4.571674255 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.815913211 V-1     T = -25 °C: 8.899292713 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02420666 V-1     T = -25 °C: 14.89228601 V-1
Break-through voltage: T = +20 °C: 414.4076443 V     T = -25 °C: 378.2012896 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:10 CET jreher Updated box and position via API.
03. Feb 2021 18:15:18 CET jreher Updated box and position via API.
07. Oct 2020 12:17:37 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:48 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:33 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:13 CET jreher Updated box and position via API.
27. Nov 2019 19:31:20 CET jreher Updated APD location via API.
25. Nov 2019 17:11:45 CET jreher Updated box and position via API.
04. Jul 2019 11:07:42 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:51 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:23:44 CET markus.moritz
13. Dec 2018 13:23:21 CET markus.moritz
30. Nov 2018 13:41:23 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.