RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026442 - Archived data from Wed, 03. February 2021 18:15:18 CET


This is all the information about APD 2407026442. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026442
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2407026433/2407026442
Unit: #1010 (barcode 1309009558)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 9.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9468694 V     T = -25 °C: 345.7855468 V
Voltage for Gain 150: T = +20 °C: 388.7933907 V     T = -25 °C: 353.1368751 V
Voltage for Gain 200: T = +20 °C: 393.1830702 V     T = -25 °C: 357.2734651 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.635868824 V-1     T = -25 °C: 5.103409537 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.50049851 V-1     T = -25 °C: 9.261582681 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.9181014 V-1     T = -25 °C: 16.44430891 V-1
Break-through voltage: T = +20 °C: 409.2626096 V     T = -25 °C: 372.8989227 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:10 CET jreher Updated box and position via API.
03. Feb 2021 18:15:18 CET jreher Updated box and position via API.
11. Aug 2020 17:21:32 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:09 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:31 CET jreher Updated box and position via API.
27. Nov 2019 19:31:20 CET jreher Updated APD location via API.
25. Nov 2019 17:11:45 CET jreher Updated box and position via API.
04. Jul 2019 11:07:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:50 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:27:13 CET markus.moritz
30. Nov 2018 13:42:38 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.