RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026437 - Archived data from Mon, 17. August 2020 15:50:33 CEST


This is all the information about APD 2407026437. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026437
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1368988 V     T = -25 °C: 345.0479365 V
Voltage for Gain 150: T = +20 °C: 387.9549015 V     T = -25 °C: 352.417743 V
Voltage for Gain 200: T = +20 °C: 392.3149517 V     T = -25 °C: 356.5577445 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.590448786 V-1     T = -25 °C: 4.932786286 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.112548883 V-1     T = -25 °C: 9.207693854 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20062946 V-1     T = -25 °C: 16.43807746 V-1
Break-through voltage: T = +20 °C: 408.1070257 V     T = -25 °C: 372.0943554 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:09 CET jreher Updated box and position via API.
03. Feb 2021 18:15:17 CET jreher Updated box and position via API.
07. Oct 2020 12:26:28 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:31 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:53 CET jreher Updated box and position via API.
27. Nov 2019 19:31:19 CET jreher Updated APD location via API.
25. Nov 2019 17:11:44 CET jreher Updated box and position via API.
04. Jul 2019 11:07:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:44 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:32:39 CET markus.moritz
30. Nov 2018 13:46:25 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.