RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026433 - Archived data from Tue, 11. August 2020 17:21:30 CEST


This is all the information about APD 2407026433. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026433
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2407026433/2407026442
Unit: #1010 (barcode 1309009558)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8456694 V     T = -25 °C: 345.7282518 V
Voltage for Gain 150: T = +20 °C: 388.7082399 V     T = -25 °C: 353.1210194 V
Voltage for Gain 200: T = +20 °C: 393.0783322 V     T = -25 °C: 357.2767638 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.677544824 V-1     T = -25 °C: 4.665444633 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.308627067 V-1     T = -25 °C: 9.45800112 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52159442 V-1     T = -25 °C: 14.87997389 V-1
Break-through voltage: T = +20 °C: 408.9834784 V     T = -25 °C: 372.9227972 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:09 CET jreher Updated box and position via API.
03. Feb 2021 18:15:17 CET jreher Updated box and position via API.
11. Aug 2020 17:21:30 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:09 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:31 CET jreher Updated box and position via API.
27. Nov 2019 19:31:19 CET jreher Updated APD location via API.
25. Nov 2019 17:11:44 CET jreher Updated box and position via API.
04. Jul 2019 11:07:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:44 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:37:49 CET markus.moritz
30. Nov 2018 13:48:08 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.