RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026432 - Archived data from Wed, 03. February 2021 18:15:17 CET


This is all the information about APD 2407026432. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026432
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2610029928/2407026432
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.868624 V     T = -25 °C: 345.778284 V
Voltage for Gain 150: T = +20 °C: 388.7473392 V     T = -25 °C: 353.1715297 V
Voltage for Gain 200: T = +20 °C: 393.1296001 V     T = -25 °C: 357.3319829 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.664011894 V-1     T = -25 °C: 5.044496149 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.264573107 V-1     T = -25 °C: 9.395422051 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34832608 V-1     T = -25 °C: 14.75331173 V-1
Break-through voltage: T = +20 °C: 409.3538457 V     T = -25 °C: 373.1191078 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:09 CET jreher Updated box and position via API.
03. Feb 2021 18:15:17 CET jreher Updated box and position via API.
07. Oct 2020 12:16:42 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:16 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:30 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:27 CET jreher Updated box and position via API.
27. Nov 2019 19:31:19 CET jreher Updated APD location via API.
25. Nov 2019 17:11:44 CET jreher Updated box and position via API.
04. Jul 2019 11:07:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:44 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:39:54 CET markus.moritz
30. Nov 2018 13:49:11 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.