Subdetector specification:  
Serial: 2407026429
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.8 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8935332 V     T = -25 °C: 351.2940013 V
Voltage for Gain 150: T = +20 °C: 394.8332362 V     T = -25 °C: 358.819606 V
Voltage for Gain 200: T = +20 °C: 399.2426452 V     T = -25 °C: 363.0285289 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.617370368 V-1     T = -25 °C: 4.781844559 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.149260327 V-1     T = -25 °C: 9.629916174 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.24614771 V-1     T = -25 °C: 15.25702036 V-1
Break-through voltage: T = +20 °C: 415.0222578 V     T = -25 °C: 378.8454786 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:09 CET jreher Updated box and position via API.
03. Feb 2021 18:15:16 CET jreher Updated box and position via API.
11. Aug 2020 17:21:30 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:11:44 CET jreher Updated box and position via API.
13. Jun 2019 14:19:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:11 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:44 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:43:08 CET markus.moritz
30. Nov 2018 13:50:10 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.