RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026409 - Archived data from Wed, 03. February 2021 18:14:10 CET


This is all the information about APD 2407026409. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026409
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2805031188/2407026409
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 2
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1036075 V     T = -25 °C: 345.8163982 V
Voltage for Gain 150: T = +20 °C: 388.8991341 V     T = -25 °C: 353.1762422 V
Voltage for Gain 200: T = +20 °C: 393.2344878 V     T = -25 °C: 357.3124429 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615609641 V-1     T = -25 °C: 5.007220838 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.185963042 V-1     T = -25 °C: 9.370705219 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39027028 V-1     T = -25 °C: 14.82625818 V-1
Break-through voltage: T = +20 °C: 408.7906106 V     T = -25 °C: 372.6955115 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:50 CET jreher Updated box and position via API.
03. Feb 2021 18:14:10 CET jreher Updated box and position via API.
11. Aug 2020 17:20:07 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:07 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:55 CET jreher Updated box and position via API.
27. Nov 2019 19:29:42 CET jreher Updated APD location via API.
25. Nov 2019 17:11:02 CET jreher Updated box and position via API.
03. Jul 2019 20:03:58 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:55 CET Tobias Corrected dark current unit.
21. Aug 2018 09:48:46 CEST markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.