RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026389 - Archived data from Tue, 11. August 2020 17:20:06 CEST


This is all the information about APD 2406026389. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026389
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 2
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3073236 V     T = -25 °C: 349.2767576 V
Voltage for Gain 150: T = +20 °C: 393.1398481 V     T = -25 °C: 356.708262 V
Voltage for Gain 200: T = +20 °C: 397.4995385 V     T = -25 °C: 360.8640745 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511334445 V-1     T = -25 °C: 4.825935156 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.935310446 V-1     T = -25 °C: 9.784696672 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.66342579 V-1     T = -25 °C: 15.69179678 V-1
Break-through voltage: T = +20 °C: 413.3411105 V     T = -25 °C: 376.5939966 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:50 CET jreher Updated box and position via API.
03. Feb 2021 18:14:09 CET jreher Updated box and position via API.
11. Aug 2020 17:20:06 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:11:01 CET jreher Updated box and position via API.
13. Jun 2019 14:19:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:55 CET Tobias Corrected dark current unit.
21. Aug 2018 09:40:54 CEST markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.