RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026386 - Archived data from Mon, 25. January 2021 14:44:59 CET


This is all the information about APD 2406026386. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026386
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2406026386/2008022063
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 2
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8558198 V     T = -25 °C: 350.2296445 V
Voltage for Gain 150: T = +20 °C: 393.7358707 V     T = -25 °C: 357.6978501 V
Voltage for Gain 200: T = +20 °C: 398.0922758 V     T = -25 °C: 361.8664428 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.689118225 V-1     T = -25 °C: 4.862046363 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.481648424 V-1     T = -25 °C: 8.93117308 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79860655 V-1     T = -25 °C: 15.95106559 V-1
Break-through voltage: T = +20 °C: 413.7698266 V     T = -25 °C: 377.3732744 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:49 CET jreher Updated box and position via API.
03. Feb 2021 18:14:09 CET jreher Updated box and position via API.
25. Jan 2021 14:44:59 CET jreher Assigned to capsule by script
17. Aug 2020 15:50:59 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:06 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:20 CET jreher Updated box and position via API.
27. Nov 2019 19:29:42 CET jreher Updated APD location via API.
25. Nov 2019 17:11:01 CET jreher Updated box and position via API.
03. Jul 2019 20:03:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:32 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:55 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:55 CET Tobias Corrected dark current unit.
21. Aug 2018 09:38:33 CEST markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.