RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026364 - Archived data from Wed, 03. February 2021 18:14:07 CET


This is all the information about APD 2406026364. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026364
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2406026364/2520029112
Unit: #1576 (barcode 1309016310)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 4 nA
   
Screening Logistics:  
Available: No
Storage Box: 2
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3521001 V     T = -25 °C: 349.5632637 V
Voltage for Gain 150: T = +20 °C: 393.2033395 V     T = -25 °C: 356.9353497 V
Voltage for Gain 200: T = +20 °C: 397.5792846 V     T = -25 °C: 361.1414492 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.312056754 V-1     T = -25 °C: 4.221363251 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.049448447 V-1     T = -25 °C: 8.895179974 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05880586 V-1     T = -25 °C: 14.10982955 V-1
Break-through voltage: T = +20 °C: 413.3980936 V     T = -25 °C: 376.753676 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:47 CET jreher Updated box and position via API.
03. Feb 2021 18:14:07 CET jreher Updated box and position via API.
08. Dec 2020 17:10:59 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:52 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:29:40 CET jreher Updated APD location via API.
25. Nov 2019 17:10:59 CET jreher Updated box and position via API.
03. Jul 2019 20:03:55 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:16 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:54 CET Tobias Corrected dark current unit.
21. Aug 2018 09:18:22 CEST markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.