RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026346 - Archived data from Wed, 03. February 2021 18:15:13 CET


This is all the information about APD 2406026346. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026346
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.044978 V     T = -25 °C: 352.0275744 V
Voltage for Gain 150: T = +20 °C: 395.9128229 V     T = -25 °C: 359.5127929 V
Voltage for Gain 200: T = +20 °C: 400.2759704 V     T = -25 °C: 363.6932817 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587745496 V-1     T = -25 °C: 4.87021033 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.125172265 V-1     T = -25 °C: 8.985531185 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28036166 V-1     T = -25 °C: 15.97699 V-1
Break-through voltage: T = +20 °C: 415.4345161 V     T = -25 °C: 379.011249 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:43 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:05 CET jreher Updated box and position via API.
03. Feb 2021 18:15:13 CET jreher Updated box and position via API.
11. Aug 2020 17:21:27 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:11 CET jreher Updated APD location via API.
25. Nov 2019 17:11:42 CET jreher Updated box and position via API.
04. Jul 2019 11:06:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:31:52 CET markus.moritz
23. Nov 2018 13:55:33 CET markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.