RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026337 - Archived data from Tue, 11. August 2020 17:21:24 CEST


This is all the information about APD 2406026337. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026337
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027080/2406026337
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 10
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7599455 V     T = -25 °C: 348.3370577 V
Voltage for Gain 150: T = +20 °C: 391.6906206 V     T = -25 °C: 355.782287 V
Voltage for Gain 200: T = +20 °C: 396.0292092 V     T = -25 °C: 360.019003 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.25796768 V-1     T = -25 °C: 5.279287801 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.31219247 V-1     T = -25 °C: 8.944535538 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53359758 V-1     T = -25 °C: 15.12564503 V-1
Break-through voltage: T = +20 °C: 411.8464879 V     T = -25 °C: 375.7411847 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:04 CET jreher Updated box and position via API.
03. Feb 2021 18:15:12 CET jreher Updated box and position via API.
11. Aug 2020 17:21:24 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:25 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:21 CET jreher Updated box and position via API.
27. Nov 2019 19:31:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:41 CET jreher Updated box and position via API.
04. Jul 2019 11:06:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:36:50 CET markus.moritz
23. Nov 2018 13:57:45 CET markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.