RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026334 - Archived data from Wed, 12. June 2019 15:02:36 CEST


This is all the information about APD 2406026334. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026334
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:39:47 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:31 CEST jreher Updated box and position via API.
05. Feb 2021 10:49:04 CET jreher Updated box and position via API.
03. Feb 2021 18:15:12 CET jreher Updated box and position via API.
11. Aug 2020 17:21:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:41 CET jreher Updated box and position via API.
04. Jul 2019 11:06:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:39:44 CET markus.moritz
23. Nov 2018 13:58:19 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.