RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026331 - Archived data from Wed, 03. February 2021 18:15:11 CET


This is all the information about APD 2406026331. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026331
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6708349 V     T = -25 °C: 350.7438301 V
Voltage for Gain 150: T = +20 °C: 394.5732536 V     T = -25 °C: 358.2513385 V
Voltage for Gain 200: T = +20 °C: 398.9392883 V     T = -25 °C: 362.4884643 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.908119341 V-1     T = -25 °C: 4.943727131 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.629499046 V-1     T = -25 °C: 9.095319234 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82038281 V-1     T = -25 °C: 16.70269579 V-1
Break-through voltage: T = +20 °C: 413.7827267 V     T = -25 °C: 377.3861456 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:04 CET jreher Updated box and position via API.
03. Feb 2021 18:15:11 CET jreher Updated box and position via API.
11. Aug 2020 17:21:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:09 CET jreher Updated APD location via API.
25. Nov 2019 17:11:41 CET jreher Updated box and position via API.
04. Jul 2019 11:06:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:41:01 CET markus.moritz
23. Nov 2018 13:59:06 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.