RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026314 - Archived data from Tue, 11. August 2020 17:21:20 CEST


This is all the information about APD 2405026314. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026314
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2304024460/2405026314
Unit: #1187 (barcode 1309013067)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 10
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7378665 V     T = -25 °C: 345.2967303 V
Voltage for Gain 150: T = +20 °C: 388.5504804 V     T = -25 °C: 352.6560255 V
Voltage for Gain 200: T = +20 °C: 392.9213734 V     T = -25 °C: 356.763345 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.700312505 V-1     T = -25 °C: 4.773235962 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.056288156 V-1     T = -25 °C: 10.14402813 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61699162 V-1     T = -25 °C: 15.77080699 V-1
Break-through voltage: T = +20 °C: 408.494395 V     T = -25 °C: 372.196564 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:02 CET jreher Updated box and position via API.
03. Feb 2021 18:15:09 CET jreher Updated box and position via API.
11. Aug 2020 17:21:20 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:35 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:26 CET jreher Updated box and position via API.
27. Nov 2019 19:31:08 CET jreher Updated APD location via API.
25. Nov 2019 17:11:39 CET jreher Updated box and position via API.
04. Jul 2019 11:06:09 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 13:46:19 CET markus.moritz
23. Nov 2018 14:02:38 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.