RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026310 - Archived data from Wed, 03. February 2021 18:15:09 CET


This is all the information about APD 2405026310. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026310
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026310/2407026436
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 6 nA
   
Screening Logistics:  
Available: No
Storage Box: 10
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6375371 V     T = -25 °C: 345.383123 V
Voltage for Gain 150: T = +20 °C: 388.4600501 V     T = -25 °C: 352.7690809 V
Voltage for Gain 200: T = +20 °C: 392.8335995 V     T = -25 °C: 356.9006571 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70288037 V-1     T = -25 °C: 4.737110269 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.340048544 V-1     T = -25 °C: 9.710235042 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83159324 V-1     T = -25 °C: 15.02169645 V-1
Break-through voltage: T = +20 °C: 408.7946769 V     T = -25 °C: 372.3837317 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:01 CET jreher Updated box and position via API.
03. Feb 2021 18:15:09 CET jreher Updated box and position via API.
29. Jan 2021 10:27:13 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:08 CET jreher Updated APD location via API.
25. Nov 2019 17:11:39 CET jreher Updated box and position via API.
04. Jul 2019 11:06:09 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 13:47:40 CET markus.moritz
13. Dec 2018 13:47:34 CET markus.moritz
23. Nov 2018 14:03:47 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.