RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026300 - Archived data from Mon, 15. February 2021 15:37:15 CET


This is all the information about APD 2405026300. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026300
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026300/2316025482
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 9
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4059517 V     T = -25 °C: 346.9433295 V
Voltage for Gain 150: T = +20 °C: 390.2235169 V     T = -25 °C: 354.3171317 V
Voltage for Gain 200: T = +20 °C: 394.5783735 V     T = -25 °C: 358.4506425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.503893364 V-1     T = -25 °C: 4.942812568 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.806941338 V-1     T = -25 °C: 9.205559595 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41868843 V-1     T = -25 °C: 16.49155444 V-1
Break-through voltage: T = +20 °C: 409.9635255 V     T = -25 °C: 373.4640951 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:00 CET jreher Updated box and position via API.
15. Feb 2021 15:37:15 CET jreher Assigned to capsule by script
05. Feb 2021 10:48:58 CET jreher Updated box and position via API.
03. Feb 2021 18:15:06 CET jreher Updated box and position via API.
11. Aug 2020 17:21:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:00 CET jreher Updated APD location via API.
25. Nov 2019 17:11:38 CET jreher Updated box and position via API.
04. Jul 2019 11:06:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:27 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 14:05:51 CET markus.moritz
23. Nov 2018 11:56:56 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.