RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026288 - Archived data from Fri, 05. February 2021 10:48:57 CET


This is all the information about APD 2405026288. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026288
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 9
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0235107 V     T = -25 °C: 344.6902347 V
Voltage for Gain 150: T = +20 °C: 387.7970499 V     T = -25 °C: 352.0220806 V
Voltage for Gain 200: T = +20 °C: 392.1109346 V     T = -25 °C: 356.1339716 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.63290275 V-1     T = -25 °C: 4.694971848 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.273543274 V-1     T = -25 °C: 9.507760851 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51759193 V-1     T = -25 °C: 15.21033334 V-1
Break-through voltage: T = +20 °C: 407.7189142 V     T = -25 °C: 371.4263573 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:00 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:31 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:48:57 CET jreher Updated box and position via API.
03. Feb 2021 18:15:05 CET jreher Updated box and position via API.
11. Aug 2020 17:21:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:59 CET jreher Updated APD location via API.
25. Nov 2019 17:11:37 CET jreher Updated box and position via API.
04. Jul 2019 11:06:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:51 CET Tobias Corrected dark current unit.
13. Dec 2018 14:02:50 CET markus.moritz
23. Nov 2018 11:59:51 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.