RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026286 - Archived data from Wed, 03. February 2021 18:15:05 CET


This is all the information about APD 2405026286. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026286
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026286/2608029769
Unit: #1344 (barcode 1309015115)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 9
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2337254 V     T = -25 °C: 346.7384155 V
Voltage for Gain 150: T = +20 °C: 390.0815404 V     T = -25 °C: 354.1378763 V
Voltage for Gain 200: T = +20 °C: 394.4733414 V     T = -25 °C: 358.2897276 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.558475082 V-1     T = -25 °C: 4.647695102 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.9197171 V-1     T = -25 °C: 9.390010477 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.81265213 V-1     T = -25 °C: 14.84207575 V-1
Break-through voltage: T = +20 °C: 410.0193817 V     T = -25 °C: 373.5279518 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:57 CET jreher Updated box and position via API.
03. Feb 2021 18:15:05 CET jreher Updated box and position via API.
07. Oct 2020 12:13:01 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:26 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:59 CET jreher Updated APD location via API.
25. Nov 2019 17:11:37 CET jreher Updated box and position via API.
04. Jul 2019 11:06:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:51 CET Tobias Corrected dark current unit.
13. Dec 2018 14:02:05 CET markus.moritz
23. Nov 2018 12:00:20 CET markus.moritz
12. Jan 2018 13:16:50 CET Tobias Imported from Hamamatsu datasheet.