RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026269 - Archived data from Tue, 11. August 2020 17:21:12 CEST


This is all the information about APD 2405026269. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026269
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 9
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5334034 V     T = -25 °C: 346.1365248 V
Voltage for Gain 150: T = +20 °C: 389.435415 V     T = -25 °C: 353.5672167 V
Voltage for Gain 200: T = +20 °C: 393.8465956 V     T = -25 °C: 357.7106456 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466626656 V-1     T = -25 °C: 4.707248159 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.404539438 V-1     T = -25 °C: 9.744205348 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72668038 V-1     T = -25 °C: 15.77501851 V-1
Break-through voltage: T = +20 °C: 409.4778764 V     T = -25 °C: 373.0192555 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:55 CET jreher Updated box and position via API.
03. Feb 2021 18:15:03 CET jreher Updated box and position via API.
11. Aug 2020 17:21:12 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:35 CET jreher Updated box and position via API.
13. Jun 2019 14:19:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:18 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:51 CET Tobias Corrected dark current unit.
13. Dec 2018 13:56:48 CET markus.moritz
23. Nov 2018 12:04:51 CET markus.moritz
12. Jan 2018 13:16:50 CET Tobias Imported from Hamamatsu datasheet.