RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026239 - Archived data from Wed, 03. February 2021 18:14:58 CET


This is all the information about APD 2405026239. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026239
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 8
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3509746 V     T = -25 °C: 352.3240802 V
Voltage for Gain 150: T = +20 °C: 396.2373301 V     T = -25 °C: 359.8768793 V
Voltage for Gain 200: T = +20 °C: 400.6621444 V     T = -25 °C: 364.1210294 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.46729715 V-1     T = -25 °C: 4.575747699 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.690876986 V-1     T = -25 °C: 9.3050951 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89254655 V-1     T = -25 °C: 14.36203311 V-1
Break-through voltage: T = +20 °C: 415.3714772 V     T = -25 °C: 379.2515983 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:04 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:55 CEST jreher Updated box and position via API.
05. Feb 2021 10:48:48 CET jreher Updated box and position via API.
03. Feb 2021 18:14:58 CET jreher Updated box and position via API.
11. Aug 2020 17:21:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:49 CET jreher Updated APD location via API.
25. Nov 2019 17:11:33 CET jreher Updated box and position via API.
04. Jul 2019 11:05:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:57 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:16 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:50 CET Tobias Corrected dark current unit.
26. Nov 2018 12:01:05 CET markus.moritz
16. Nov 2018 11:44:09 CET markus.moritz
12. Jan 2018 13:16:50 CET Tobias Imported from Hamamatsu datasheet.