RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026200 - Archived data from Tue, 11. August 2020 17:21:02 CEST


This is all the information about APD 2404026200. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026200
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026200/0822008884
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 8
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6236891 V     T = -25 °C: 348.0606132 V
Voltage for Gain 150: T = +20 °C: 391.5360819 V     T = -25 °C: 355.4917633 V
Voltage for Gain 200: T = +20 °C: 395.9325406 V     T = -25 °C: 359.6529578 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.389014683 V-1     T = -25 °C: 4.894143319 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.499818528 V-1     T = -25 °C: 9.037873141 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.60074362 V-1     T = -25 °C: 16.01651961 V-1
Break-through voltage: T = +20 °C: 411.5744802 V     T = -25 °C: 374.9195643 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:44 CET jreher Updated box and position via API.
03. Feb 2021 18:14:55 CET jreher Updated box and position via API.
11. Aug 2020 17:21:02 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:36 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:00 CET jreher Updated box and position via API.
27. Nov 2019 19:30:47 CET jreher Updated APD location via API.
25. Nov 2019 17:11:31 CET jreher Updated box and position via API.
04. Jul 2019 11:05:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:53 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Nov 2018 12:17:28 CET markus.moritz
26. Nov 2018 11:19:25 CET markus.moritz
16. Nov 2018 11:54:08 CET markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.