RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026195 - Archived data from Fri, 05. February 2021 10:48:43 CET


This is all the information about APD 2404026195. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026195
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.325075 V     T = -25 °C: 347.8368703 V
Voltage for Gain 150: T = +20 °C: 391.194789 V     T = -25 °C: 355.2480999 V
Voltage for Gain 200: T = +20 °C: 395.5727765 V     T = -25 °C: 359.4038947 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.505512993 V-1     T = -25 °C: 4.980251596 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.826253948 V-1     T = -25 °C: 9.280900144 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51084238 V-1     T = -25 °C: 14.64070489 V-1
Break-through voltage: T = +20 °C: 409.2049517 V     T = -25 °C: 372.8928694 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:43 CET jreher Updated box and position via API.
03. Feb 2021 18:14:55 CET jreher Updated box and position via API.
11. Aug 2020 17:21:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:47 CET jreher Updated APD location via API.
25. Nov 2019 17:11:31 CET jreher Updated box and position via API.
04. Jul 2019 11:05:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:54 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Nov 2018 12:23:38 CET markus.moritz
26. Nov 2018 11:45:02 CET markus.moritz
16. Nov 2018 11:56:12 CET markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.