RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026191 - Archived data from Wed, 03. February 2021 18:14:54 CET


This is all the information about APD 2404026191. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026191
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2291754 V     T = -25 °C: 351.446984 V
Voltage for Gain 150: T = +20 °C: 395.1540001 V     T = -25 °C: 358.9443985 V
Voltage for Gain 200: T = +20 °C: 399.4903523 V     T = -25 °C: 363.1655568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.645205404 V-1     T = -25 °C: 4.746111652 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.911302666 V-1     T = -25 °C: 8.771278354 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35037209 V-1     T = -25 °C: 14.91665826 V-1
Break-through voltage: T = +20 °C: 414.6823367 V     T = -25 °C: 378.4734198 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:24:45 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:09 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:21:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:43 CET jreher Updated box and position via API.
03. Feb 2021 18:14:54 CET jreher Updated box and position via API.
11. Aug 2020 17:21:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:46 CET jreher Updated APD location via API.
25. Nov 2019 17:11:30 CET jreher Updated box and position via API.
04. Jul 2019 11:05:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:21 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Sep 2018 11:36:16 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.