RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026190 - Archived data from Wed, 03. February 2021 18:14:54 CET


This is all the information about APD 2404026190. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026190
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.9408791 V     T = -25 °C: 348.6175808 V
Voltage for Gain 150: T = +20 °C: 391.8516157 V     T = -25 °C: 355.9955681 V
Voltage for Gain 200: T = +20 °C: 396.2894439 V     T = -25 °C: 360.2992889 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.104149187 V-1     T = -25 °C: 4.539947478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.292885676 V-1     T = -25 °C: 9.230772874 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18168741 V-1     T = -25 °C: 16.23890402 V-1
Break-through voltage: T = +20 °C: 411.7683411 V     T = -25 °C: 376.0126958 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:42 CET jreher Updated box and position via API.
03. Feb 2021 18:14:54 CET jreher Updated box and position via API.
11. Aug 2020 17:21:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:46 CET jreher Updated APD location via API.
25. Nov 2019 17:11:30 CET jreher Updated box and position via API.
04. Jul 2019 11:05:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:21 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Sep 2018 11:35:46 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.