RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026189 - Archived data from Tue, 11. August 2020 17:20:59 CEST


This is all the information about APD 2404026189. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026189
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026189/2418027361
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 8
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7287382 V     T = -25 °C: 346.6387169 V
Voltage for Gain 150: T = +20 °C: 389.5977882 V     T = -25 °C: 354.1028043 V
Voltage for Gain 200: T = +20 °C: 394.0932484 V     T = -25 °C: 358.2682732 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.507187352 V-1     T = -25 °C: 4.693021205 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.651667561 V-1     T = -25 °C: 9.668065341 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.35801559 V-1     T = -25 °C: 14.55524439 V-1
Break-through voltage: T = +20 °C: 410.1468625 V     T = -25 °C: 374.1155192 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:42 CET jreher Updated box and position via API.
03. Feb 2021 18:14:54 CET jreher Updated box and position via API.
11. Aug 2020 17:20:59 CEST jreher Updated APD characteristics via API.
27. Mar 2020 11:32:40 CET jreher Assigned to capsule by script
13. Feb 2020 15:25:41 CET jreher Updated box and position via API.
27. Nov 2019 19:30:46 CET jreher Updated APD location via API.
25. Nov 2019 17:11:30 CET jreher Updated box and position via API.
04. Jul 2019 11:05:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:21 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Sep 2018 11:35:12 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.