RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026182 - Archived data from Wed, 03. February 2021 18:14:53 CET


This is all the information about APD 2404026182. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026182
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 2.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6882589 V     T = -25 °C: 349.1767139 V
Voltage for Gain 150: T = +20 °C: 392.7187694 V     T = -25 °C: 356.7077484 V
Voltage for Gain 200: T = +20 °C: 397.1961123 V     T = -25 °C: 360.956027 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.35343343 V-1     T = -25 °C: 4.727007902 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.653964297 V-1     T = -25 °C: 9.265369701 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.50478742 V-1     T = -25 °C: 14.49855166 V-1
Break-through voltage: T = +20 °C: 412.4368526 V     T = -25 °C: 376.530692 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:41 CET jreher Updated box and position via API.
03. Feb 2021 18:14:53 CET jreher Updated box and position via API.
11. Aug 2020 17:20:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:46 CET jreher Updated APD location via API.
25. Nov 2019 17:11:29 CET jreher Updated box and position via API.
04. Jul 2019 11:05:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:20 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Sep 2018 11:31:20 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.