RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026171 - Archived data from Wed, 03. February 2021 18:14:49 CET


This is all the information about APD 2404026171. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026171
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.5 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.0128871 V     T = -25 °C: 355.0945757 V
Voltage for Gain 150: T = +20 °C: 398.9452842 V     T = -25 °C: 362.6975142 V
Voltage for Gain 200: T = +20 °C: 403.3581565 V     T = -25 °C: 366.9533486 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.556483253 V-1     T = -25 °C: 4.743702956 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.945364355 V-1     T = -25 °C: 9.531665619 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84926262 V-1     T = -25 °C: 14.91044571 V-1
Break-through voltage: T = +20 °C: 418.4707418 V     T = -25 °C: 382.3753391 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:17 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:36 CET jreher Updated box and position via API.
03. Feb 2021 18:14:49 CET jreher Updated box and position via API.
11. Aug 2020 17:20:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:38 CET jreher Updated APD location via API.
25. Nov 2019 17:11:28 CET jreher Updated box and position via API.
04. Jul 2019 11:05:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:51 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 13:24:42 CEST markus.moritz
26. Sep 2018 12:06:19 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.