RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026167 - Archived data from Fri, 05. February 2021 10:48:35 CET


This is all the information about APD 2404026167. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026167
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 7
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.8454888 V     T = -25 °C: 344.8242848 V
Voltage for Gain 150: T = +20 °C: 387.679151 V     T = -25 °C: 352.1702195 V
Voltage for Gain 200: T = +20 °C: 392.0367713 V     T = -25 °C: 356.296226 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.71771434 V-1     T = -25 °C: 5.051218407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.356467452 V-1     T = -25 °C: 9.433857913 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65833871 V-1     T = -25 °C: 14.99222996 V-1
Break-through voltage: T = +20 °C: 407.8633994 V     T = -25 °C: 371.7918038 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:52 CET jreher Assigned to capsule by script
05. Feb 2021 10:48:35 CET jreher Updated box and position via API.
03. Feb 2021 18:14:49 CET jreher Updated box and position via API.
18. Dec 2020 14:00:05 CET jreher Updated box and position via API.
11. Aug 2020 17:20:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:38 CET jreher Updated APD location via API.
25. Nov 2019 17:11:28 CET jreher Updated box and position via API.
04. Jul 2019 11:05:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 14:05:51 CEST markus.moritz
26. Sep 2018 11:56:11 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.