RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026166 - Archived data from Tue, 11. August 2020 17:20:54 CEST


This is all the information about APD 2404026166. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026166
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026166/2404026201
Unit: #1011 (barcode 1309009534)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8448748 V     T = -25 °C: 345.7480318 V
Voltage for Gain 150: T = +20 °C: 388.7230683 V     T = -25 °C: 353.1167043 V
Voltage for Gain 200: T = +20 °C: 393.1069431 V     T = -25 °C: 357.2608364 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.674740752 V-1     T = -25 °C: 4.647297629 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251667198 V-1     T = -25 °C: 9.484397231 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35326302 V-1     T = -25 °C: 14.9491249 V-1
Break-through voltage: T = +20 °C: 408.8307241 V     T = -25 °C: 372.6776785 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:35 CET jreher Updated box and position via API.
03. Feb 2021 18:14:49 CET jreher Updated box and position via API.
11. Aug 2020 17:20:54 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:09 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:31 CET jreher Updated box and position via API.
27. Nov 2019 19:30:38 CET jreher Updated APD location via API.
25. Nov 2019 17:11:27 CET jreher Updated box and position via API.
04. Jul 2019 11:05:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 14:04:08 CEST markus.moritz
26. Sep 2018 11:57:20 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.