RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026139 - Archived data from Wed, 03. February 2021 18:14:47 CET


This is all the information about APD 2403026139. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026139
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0821008855/2403026139
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3478052 V     T = -25 °C: 346.9369627 V
Voltage for Gain 150: T = +20 °C: 390.1773557 V     T = -25 °C: 354.3641027 V
Voltage for Gain 200: T = +20 °C: 394.5400338 V     T = -25 °C: 358.5448924 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531881217 V-1     T = -25 °C: 4.963576433 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.915689063 V-1     T = -25 °C: 9.169601641 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.68243733 V-1     T = -25 °C: 16.31874316 V-1
Break-through voltage: T = +20 °C: 409.1773371 V     T = -25 °C: 373.7279976 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:32 CET jreher Updated box and position via API.
03. Feb 2021 18:14:47 CET jreher Updated box and position via API.
11. Aug 2020 17:20:53 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:44:53 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:36 CET jreher Updated box and position via API.
27. Nov 2019 19:30:37 CET jreher Updated APD location via API.
25. Nov 2019 17:11:26 CET jreher Updated box and position via API.
04. Jul 2019 11:05:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 14:02:18 CEST markus.moritz
26. Sep 2018 11:57:56 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.