RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026135 - Archived data from Tue, 11. August 2020 17:20:52 CEST


This is all the information about APD 2403026135. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026135
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026135/2407026465
Unit: #844 (barcode 1309009275)
Preamp: 4413
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 5 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5794608 V     T = -25 °C: 347.3050194 V
Voltage for Gain 150: T = +20 °C: 390.4341827 V     T = -25 °C: 354.7105787 V
Voltage for Gain 200: T = +20 °C: 394.7947262 V     T = -25 °C: 358.8527948 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43097318 V-1     T = -25 °C: 4.830385724 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.654037947 V-1     T = -25 °C: 9.822848622 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06353388 V-1     T = -25 °C: 15.65246879 V-1
Break-through voltage: T = +20 °C: 410.3010858 V     T = -25 °C: 374.1373779 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:31 CET jreher Updated box and position via API.
03. Feb 2021 18:14:47 CET jreher Updated box and position via API.
11. Aug 2020 17:20:52 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:30:36 CET jreher Updated APD location via API.
25. Nov 2019 17:11:26 CET jreher Updated box and position via API.
15. Jul 2019 15:47:53 CEST jreher Assigned to unit by script
15. Jul 2019 15:25:33 CEST jreher Assigned to capsule by script
04. Jul 2019 11:05:45 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:11 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
02. Oct 2018 14:40:19 CEST markus.moritz
26. Sep 2018 11:43:58 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.