RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026133 - Archived data from Tue, 11. August 2020 17:20:52 CEST


This is all the information about APD 2403026133. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026133
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026133/2403026136
Unit: #841 (barcode 1309009244)
Preamp: 4459
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 10 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8083571 V     T = -25 °C: 345.4910194 V
Voltage for Gain 150: T = +20 °C: 388.7036716 V     T = -25 °C: 352.9055085 V
Voltage for Gain 200: T = +20 °C: 393.0940642 V     T = -25 °C: 357.0672124 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.688512561 V-1     T = -25 °C: 4.752230552 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.269573224 V-1     T = -25 °C: 9.62195233 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40514768 V-1     T = -25 °C: 15.27680104 V-1
Break-through voltage: T = +20 °C: 408.1717697 V     T = -25 °C: 372.0984066 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:30 CET jreher Updated box and position via API.
03. Feb 2021 18:14:47 CET jreher Updated box and position via API.
11. Aug 2020 17:20:52 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:30:36 CET jreher Updated APD location via API.
25. Nov 2019 17:11:26 CET jreher Updated box and position via API.
15. Jul 2019 15:45:47 CEST jreher Assigned to unit by script
15. Jul 2019 15:22:55 CEST jreher Assigned to capsule by script
04. Jul 2019 11:05:45 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:11 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
02. Oct 2018 14:38:31 CEST markus.moritz
02. Oct 2018 14:38:19 CEST markus.moritz
26. Sep 2018 11:49:20 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.