RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026121 - Archived data from Wed, 03. February 2021 18:14:45 CET


This is all the information about APD 2403026121. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026121
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026121/2407026434
Unit: #852 (barcode 1309009350)
Preamp: 4394
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8230793 V     T = -25 °C: 346.422665 V
Voltage for Gain 150: T = +20 °C: 389.6989783 V     T = -25 °C: 353.8388823 V
Voltage for Gain 200: T = +20 °C: 394.0755589 V     T = -25 °C: 357.9998712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.673107586 V-1     T = -25 °C: 4.772392692 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.300015618 V-1     T = -25 °C: 9.686429841 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4739268 V-1     T = -25 °C: 15.38622118 V-1
Break-through voltage: T = +20 °C: 410.0267083 V     T = -25 °C: 373.6716111 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:27 CET jreher Updated box and position via API.
03. Feb 2021 18:14:45 CET jreher Updated box and position via API.
11. Aug 2020 17:20:49 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:50 CET jreher Updated box and position via API.
27. Nov 2019 19:30:35 CET jreher Updated APD location via API.
25. Nov 2019 17:11:25 CET jreher Updated box and position via API.
17. Oct 2019 14:01:45 CEST tholtmann Assigned to unit by script
17. Oct 2019 12:46:15 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:05:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:54 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
02. Oct 2018 14:47:00 CEST markus.moritz
26. Sep 2018 11:41:05 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.