RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026120 - Archived data from Wed, 03. February 2021 18:14:45 CET


This is all the information about APD 2403026120. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026120
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2407026431/2403026120
Unit: #839 (barcode 1309009220)
Preamp: 4557
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 7
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8465492 V     T = -25 °C: 345.5487248 V
Voltage for Gain 150: T = +20 °C: 388.7099912 V     T = -25 °C: 352.9379905 V
Voltage for Gain 200: T = +20 °C: 393.0773083 V     T = -25 °C: 357.0856091 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.676877987 V-1     T = -25 °C: 4.727024772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.328041596 V-1     T = -25 °C: 9.632955987 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58910516 V-1     T = -25 °C: 15.32846857 V-1
Break-through voltage: T = +20 °C: 408.8606722 V     T = -25 °C: 372.5934094 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:27 CET jreher Updated box and position via API.
03. Feb 2021 18:14:45 CET jreher Updated box and position via API.
11. Aug 2020 17:20:49 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:30:35 CET jreher Updated APD location via API.
25. Nov 2019 17:11:25 CET jreher Updated box and position via API.
15. Jul 2019 15:43:54 CEST jreher Assigned to unit by script
15. Jul 2019 15:20:35 CEST jreher Assigned to capsule by script
04. Jul 2019 11:05:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:54 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
02. Oct 2018 14:45:57 CEST markus.moritz
26. Sep 2018 11:41:33 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.