Show Hamamatsu Avalanche Photo Diode 2403026118 - Archived data from Wed, 12. June 2019 16:45:53 CEST
This is all the information about APD 2403026118. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2403026118 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B05 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 383.9 V |
Dark current: | 6.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 7 |
Position in Box: | 2 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Sep 2018 |
Sent for analysis after irradiation: | 02. Oct 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 27. Sep 2018 |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 28. Sep 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:48:26 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:14:45 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:20:49 CEST | jreher | Updated APD characteristics via API. |
31. Mar 2020 08:53:31 CEST | jreher | Assigned to capsule by script |
13. Feb 2020 14:23:08 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:30:35 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:11:25 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:05:44 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:45:53 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:30:49 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:01:10 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:12:47 CET | Tobias | Corrected dark current unit. |
02. Oct 2018 14:44:03 CEST | markus.moritz | |
26. Sep 2018 11:42:29 CEST | markus.moritz | |
12. Jan 2018 13:16:48 CET | Tobias | Imported from Hamamatsu datasheet. |