RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026111 - Archived data from Wed, 03. February 2021 18:14:04 CET


This is all the information about APD 2403026111. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026111
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0718006751/2403026111
Unit: #1586 (barcode 1309016419)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 1
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4342325 V     T = -25 °C: 345.1518284 V
Voltage for Gain 150: T = +20 °C: 388.2282776 V     T = -25 °C: 352.5043668 V
Voltage for Gain 200: T = +20 °C: 392.6051131 V     T = -25 °C: 356.6443849 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450682637 V-1     T = -25 °C: 4.83795155 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.147798605 V-1     T = -25 °C: 9.574533346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17725553 V-1     T = -25 °C: 14.95139796 V-1
Break-through voltage: T = +20 °C: 408.22009 V     T = -25 °C: 372.1586329 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:36 CET jreher Updated box and position via API.
03. Feb 2021 18:14:04 CET jreher Updated box and position via API.
08. Dec 2020 17:11:07 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:53 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:28:41 CET jreher Updated APD location via API.
25. Nov 2019 17:10:57 CET jreher Updated box and position via API.
25. Nov 2019 16:56:05 CET jreher Updated box and position via API.
03. Jul 2019 20:03:17 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:15 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
21. Aug 2018 09:10:28 CEST markus.moritz
20. Aug 2018 14:48:56 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.