RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026103 - Archived data from Thu, 03. January 2019 00:12:46 CET


This is all the information about APD 2403026103. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026103
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 12.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 1
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:35 CET jreher Updated box and position via API.
03. Feb 2021 18:14:03 CET jreher Updated box and position via API.
11. Aug 2020 17:19:59 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:10:56 CET jreher Updated box and position via API.
25. Nov 2019 16:56:04 CET jreher Updated box and position via API.
13. Jun 2019 14:19:16 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:46 CET Tobias Corrected dark current unit.
21. Aug 2018 09:08:41 CEST markus.moritz
20. Aug 2018 14:37:30 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.