RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026101 - Archived data from Wed, 03. February 2021 18:14:03 CET


This is all the information about APD 2403026101. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026101
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7219106 V     T = -25 °C: 349.8391553 V
Voltage for Gain 150: T = +20 °C: 393.5329329 V     T = -25 °C: 357.289144 V
Voltage for Gain 200: T = +20 °C: 397.8701843 V     T = -25 °C: 361.4736235 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.69338476 V-1     T = -25 °C: 4.970305874 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.439360284 V-1     T = -25 °C: 9.113113257 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13137785 V-1     T = -25 °C: 15.87615017 V-1
Break-through voltage: T = +20 °C: 412.4102808 V     T = -25 °C: 376.3588052 V
   
Notes: foam


Version history

Time Author Change comment
25. Sep 2021 15:57:27 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:18 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:28:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:47:34 CET jreher Updated box and position via API.
03. Feb 2021 18:14:03 CET jreher Updated box and position via API.
11. Aug 2020 17:19:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:28:40 CET jreher Updated APD location via API.
25. Nov 2019 17:10:56 CET jreher Updated box and position via API.
25. Nov 2019 16:56:04 CET jreher Updated box and position via API.
03. Jul 2019 20:03:17 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:46 CET Tobias Corrected dark current unit.
21. Aug 2018 09:08:23 CEST markus.moritz
20. Aug 2018 14:39:48 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.