RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026100 - Archived data from Tue, 11. August 2020 17:19:58 CEST


This is all the information about APD 2403026100. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026100
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 1
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.375684 V     T = -25 °C: 345.1232323 V
Voltage for Gain 150: T = +20 °C: 388.2047043 V     T = -25 °C: 352.4957561 V
Voltage for Gain 200: T = +20 °C: 392.5673166 V     T = -25 °C: 356.6080671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.490824148 V-1     T = -25 °C: 4.922084775 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.190874004 V-1     T = -25 °C: 8.913851958 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29380971 V-1     T = -25 °C: 16.04264303 V-1
Break-through voltage: T = +20 °C: 408.4022411 V     T = -25 °C: 372.1484443 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:34 CET jreher Updated box and position via API.
03. Feb 2021 18:14:03 CET jreher Updated box and position via API.
07. Oct 2020 12:19:10 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:19:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:28:40 CET jreher Updated APD location via API.
25. Nov 2019 17:10:56 CET jreher Updated box and position via API.
25. Nov 2019 16:56:04 CET jreher Updated box and position via API.
03. Jul 2019 20:03:17 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:46 CET Tobias Corrected dark current unit.
21. Aug 2018 09:08:19 CEST markus.moritz
20. Aug 2018 14:40:34 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.