RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2403026088 - Archived data from Mon, 25. November 2019 16:56:03 CET


This is all the information about APD 2403026088. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2403026088
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 1
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 999
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: foam


Version history

Time Author Change comment
26. Apr 2021 13:10:55 CEST oafedulidis
05. Feb 2021 10:47:31 CET jreher Updated box and position via API.
03. Feb 2021 18:14:01 CET jreher Updated box and position via API.
11. Aug 2020 17:19:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 16:51:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 16:42:16 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:21 CET jreher Updated box and position via API.
27. Nov 2019 19:28:39 CET jreher Updated APD location via API.
25. Nov 2019 17:10:55 CET jreher Updated box and position via API.
25. Nov 2019 16:56:03 CET jreher Updated box and position via API.
03. Jul 2019 20:03:16 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:13:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:54:11 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:46 CET Tobias Corrected dark current unit.
21. Aug 2018 09:06:28 CEST markus.moritz
20. Aug 2018 14:32:23 CEST markus.moritz
12. Jan 2018 13:16:47 CET Tobias Imported from Hamamatsu datasheet.