RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026047 - Archived data from Tue, 11. August 2020 17:20:19 CEST


This is all the information about APD 2402026047. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026047
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 3
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9494362 V     T = -25 °C: 345.5530058 V
Voltage for Gain 150: T = +20 °C: 388.7132958 V     T = -25 °C: 352.9245318 V
Voltage for Gain 200: T = +20 °C: 393.0338426 V     T = -25 °C: 357.0552738 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.670882086 V-1     T = -25 °C: 4.72810339 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.344654311 V-1     T = -25 °C: 9.600339177 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62582277 V-1     T = -25 °C: 15.2085824 V-1
Break-through voltage: T = +20 °C: 408.5108838 V     T = -25 °C: 372.4109067 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:59 CET jreher Updated box and position via API.
03. Feb 2021 18:14:19 CET jreher Updated box and position via API.
03. Sep 2020 14:25:39 CEST jreher Assigned to capsule by script
11. Aug 2020 17:20:19 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:30 CET jreher Updated box and position via API.
27. Nov 2019 19:29:54 CET jreher Updated APD location via API.
25. Nov 2019 17:11:10 CET jreher Updated box and position via API.
04. Jul 2019 11:04:31 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:21 CEST jreher Updated APD location via API.
04. Jul 2019 11:03:01 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:27 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:45 CET Tobias Corrected dark current unit.
21. Aug 2018 09:02:35 CEST markus.moritz
20. Aug 2018 13:50:54 CEST markus.moritz
12. Jan 2018 13:16:47 CET Tobias Imported from Hamamatsu datasheet.