RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026043 - Archived data from Thu, 04. July 2019 11:02:27 CEST


This is all the information about APD 2402026043. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026043
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 3
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:59 CET jreher Updated box and position via API.
03. Feb 2021 18:14:18 CET jreher Updated box and position via API.
11. Aug 2020 17:20:18 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:08:41 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:06 CET jreher Updated box and position via API.
27. Nov 2019 19:29:54 CET jreher Updated APD location via API.
25. Nov 2019 17:11:09 CET jreher Updated box and position via API.
04. Jul 2019 11:04:31 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:20 CEST jreher Updated APD location via API.
04. Jul 2019 11:03:00 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:27 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:45 CET Tobias Corrected dark current unit.
21. Aug 2018 09:01:32 CEST markus.moritz
20. Aug 2018 13:54:02 CEST markus.moritz
12. Jan 2018 13:16:47 CET Tobias Imported from Hamamatsu datasheet.