RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026026 - Archived data from Tue, 11. August 2020 17:20:15 CEST


This is all the information about APD 2402026026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026026
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2402026026/2407026466
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 3
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2861179 V     T = -25 °C: 345.7840644 V
Voltage for Gain 150: T = +20 °C: 389.1125248 V     T = -25 °C: 353.1882291 V
Voltage for Gain 200: T = +20 °C: 393.4872765 V     T = -25 °C: 357.3508762 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.557616043 V-1     T = -25 °C: 4.652484955 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.989734462 V-1     T = -25 °C: 9.363186125 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92693967 V-1     T = -25 °C: 14.84675104 V-1
Break-through voltage: T = +20 °C: 405.5264862 V     T = -25 °C: 371.6473476 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:57 CET jreher Updated box and position via API.
03. Feb 2021 18:14:17 CET jreher Updated box and position via API.
11. Aug 2020 17:20:15 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:26:04 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:35 CET jreher Updated box and position via API.
27. Nov 2019 19:29:53 CET jreher Updated APD location via API.
25. Nov 2019 17:11:08 CET jreher Updated box and position via API.
04. Jul 2019 11:04:30 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:19 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:59 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:25 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:14 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:55 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:44 CET Tobias Corrected dark current unit.
21. Aug 2018 08:56:14 CEST markus.moritz
20. Aug 2018 13:32:34 CEST markus.moritz
12. Jan 2018 13:16:47 CET Tobias Imported from Hamamatsu datasheet.