RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026015 - Archived data from Tue, 11. August 2020 17:20:14 CEST


This is all the information about APD 2402026015. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026015
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9850349 V     T = -25 °C: 351.0960656 V
Voltage for Gain 150: T = +20 °C: 394.7148733 V     T = -25 °C: 358.5110419 V
Voltage for Gain 200: T = +20 °C: 399.1119556 V     T = -25 °C: 362.7549342 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434316816 V-1     T = -25 °C: 4.627066581 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.052153904 V-1     T = -25 °C: 8.695150836 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.23256143 V-1     T = -25 °C: 16.45742507 V-1
Break-through voltage: T = +20 °C: 414.3648707 V     T = -25 °C: 378.125188 V
   
Notes: foam


Version history

Time Author Change comment
26. Apr 2021 14:30:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:47:56 CET jreher Updated box and position via API.
03. Feb 2021 18:14:16 CET jreher Updated box and position via API.
11. Aug 2020 17:20:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:29:52 CET jreher Updated APD location via API.
25. Nov 2019 17:11:06 CET jreher Updated box and position via API.
04. Jul 2019 11:04:28 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:18 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:59 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:24 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:56:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:44 CET Tobias Corrected dark current unit.
21. Aug 2018 08:53:37 CEST markus.moritz
20. Aug 2018 13:22:24 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.