RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026002 - Archived data from Mon, 26. April 2021 14:30:38 CEST


This is all the information about APD 2402026002. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026002
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.2953277 V     T = -25 °C: 352.1226768 V
Voltage for Gain 150: T = +20 °C: 396.1253791 V     T = -25 °C: 359.6694597 V
Voltage for Gain 200: T = +20 °C: 400.4565292 V     T = -25 °C: 363.8909784 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.35749892 V-1     T = -25 °C: 4.646572515 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.859932912 V-1     T = -25 °C: 9.195018354 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.8499593 V-1     T = -25 °C: 15.20983484 V-1
Break-through voltage: T = +20 °C: 415.2199612 V     T = -25 °C: 379.0873404 V
   
Notes: foam


Version history

Time Author Change comment
26. Oct 2021 10:53:06 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:10 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:30:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:47:55 CET jreher Updated box and position via API.
03. Feb 2021 18:14:14 CET jreher Updated box and position via API.
11. Aug 2020 17:20:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:29:51 CET jreher Updated APD location via API.
25. Nov 2019 17:11:05 CET jreher Updated box and position via API.
04. Jul 2019 11:04:28 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:17 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:58 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:24 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:11 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:56:13 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:44 CET Tobias Corrected dark current unit.
21. Aug 2018 08:48:46 CEST markus.moritz
20. Aug 2018 11:58:47 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.